When you would like to secure affordable procurement options for Herley Chicago part number 32P238312 21 11, do not hesitate to take advantage of the Request for Quote (RFQ) form on this page. As you complete this form, be sure to offer us important details like your target price and expected fulfillment timeframe, as well as information for contacting you with our response. Within 15 minutes of receiving and reviewing your submission, a member of our staff will reach out to you to present a tailored solution on Herley Chicago part number 32P238312 21 11 for your comparisons.
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5330-00-171-8301 Item PartTypeName: GASKET | 5330 | 001718301 | P | |||
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | ||||||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| 32P238312-21-11 | 6 | 2 | 3 |
| MRC | Criteria | Characteristic |
|---|---|---|
| AAGR | CROSS-SECTIONAL SHAPE STYLE | SOLID SINGLE OR COMPOSITION |
| AAUB | HOLE DIAMETER | 0.120 INCHES MINIMUM AND 0.180 INCHES MAXIMUM |
| ABHP | OVERALL LENGTH | 3.070 INCHES NOMINAL |
| ABMK | OVERALL WIDTH | 3.070 INCHES NOMINAL |
| ABVL | APERTURE DIAMETER | 2.300 INCHES NOMINAL |
| ADUY | CENTER TO CENTER DISTANCE BETWEEN BOLT HOLES ALONG WIDTH | 2.300 INCHES NOMINAL |
| ADUZ | CENTER TO CENTER DISTANCE BETWEEN BOLT HOLES ALONG LENGTH | 1.400 INCHES NOMINAL |
| CQFM | HARDNESS RATING | 55.0 SHORE DUROMETER A MINIMUM OVERALL AND 65.0 SHORE DUROMETER A MAXIMUM OVERALL |
| MATT | MATERIAL | RUBBER SYNTHETIC OVERALL |
| MDCL | MATERIAL DOCUMENT AND CLASSIFICATION | ZZ-R-765 CLASS 1B GRADE 60 FED SPEC SINGLE MATERIAL RESPONSE OVERALL |
![]() |
AS9120B and ISO 9001:2015 |
![]() |
Aviation Suppliers Association Member |
![]() |
FAA AC 0056B Accredited |
![]() |
AS 6081:2012 Certification |
![]() |
ESD S20.20-2014 Certification |
OVER 75000
Same-day
COMPLETE PURCHASING
FULLY CERTIFIED
COMPETITIVEBefore You Go, Take a Look at Our NSN Parts Catalog! Don’t forget That We Can offer A Competitive Quote Within 15 Minutes of Receiving Your RFQ form!
Request for Quote